Does a verification deadline automatically mean the meter needs replacing?
No. A verification deadline does not itself mean the meter is faulty. Ask the utility about verification or replacement, handling seals and registering the meter.
Water meter replacement in Kyiv and the region. Inspection, price confirmation before work and a final check. Guide price: from ₴700.

A water meter may need replacement if it is damaged or testing confirms a fault. Reaching the end of a verification interval does not by itself mean the meter must be replaced.
We isolate the water, remove the old meter, inspect threads and seals, fit the new meter in the correct flow direction and pressure-test the joints.
No. A verification deadline does not itself mean the meter is faulty. Ask the utility about verification or replacement, handling seals and registering the meter.
Before removal, confirm the seal and documentation procedure with the utility. Installation does not replace official sealing and registration of the new meter.
The page shows a guide price of from ₴700. The final amount depends on the actual condition, access and materials and is agreed before work starts.
Suitable customer-supplied materials can be used, or their selection can be agreed with the technician. Dimensions, ratings and compatibility should be checked before purchase to avoid paying twice for an unsuitable part.
Completed work is covered by a warranty. The warranty terms depend on the service, the condition of existing systems and the installed materials and are recorded when the result is handed over.
Complete the short form and choose an available messenger. Your request will open ready to send.
Choose an option to book online, call or message a specialist.
▣